Land plots are not provided / Rent
PharmMedPolis of the Republic of Tatartsan
Республика Татарстан
Medical business park: 422623 Republic of Tatarstan Laishevsky district the village of Bolshoye Kabany Vystavochnaya St. 1 Claster B
Type of park
Greenfield
Form of ownership
Public
Created in
2020
Park status
Operating
Management company name
ООО "ФармМедПолис РТ"
Taxpayer Personal Identification Number (INN) of Management company
1660313668
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Description
We offer for rent from 100 to 36,000 sq.m. production and office space on the territory of Kazan EXPO, 20 km from the city center near the airport. Characteristics: — power supply: maximum power of one block of premises (9,000 sq.m.) up to 1 MW; — water supply: the maximum volume of consumption on the block is 25 m3 per day; - heat supply: normalized room temperature from +18 to +22; - ceiling height 6.5 m; - module dimensions 192x48 m; - gate 5x5 m; - floor "anti-dust" with an impact of 5 t/m2; — ventilation: general air handling unit; - Fire alarm system; – there is parking for up to 100 places (for cars) and 17 places (for euro trucks); — presentation center for 2,000 sq.m. Features and Benefits: — an infrastructure platform with a unique ecosystem for the development of innovations and business; — special economic zone with tax preferences, free customs zone; — public and private support for representatives and residents. Great place to grow your business., HTML
Land plot
Total area of industrial park, hectares
116 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
-
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Agreement with the subject of the Russian Federation
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
25000 m2
Maximum ceiling height of industrial premises, meters
6,5 m
The presence of a crane beam
No
Max floor load
5 t/m2
Office areas, square meters
11000 m2
Average selling price for manufacturing buildings/premises, rub./m2
550 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
6600 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
36000 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
No
Total electricity (power) capacity, MW
2 MW
Free available electricity (power) supply capacity, MW
1,5 MW
Electricity supply source
Connection to external networks
Name of grid company
"ТАТЭНЕРГОСБЫТ"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
8 rub./kWh
Voltage level for connection of residents
CH2 (6-10kB)
Reliability category
2
Gas Supply
Gas supply
No
Total gas supply capacity, cubic meters/hour
0 m3/h
Available gas supply capacity, cubic meters/hour
НЕТ m3/h
Gas supply tariff, cubic meters/hour
НЕТ rub/m3
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
84,065 Gcal / h
Free available heating supply, gigacalories/hour
43 Gcal / h
Heating supply source
Private boiler room
Heat carrier
Water
Heat supply tariff, rub/gigacalories
1574 rub/Gcal
Water Supply
Water supply
No
Total water supply capacity, cubic meters/hour
25 m3/h
Available water supply capacity, cubic meters/hour
22 m3/h
Water supply source
External water utility
Water supply tariff
34 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
No
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more