Sale
South Gate Industrial Park
Московская область
Management company name
Radius Group
Taxpayer Personal Identification Number (INN) of Management company
5009049271
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
138 ha
Available area of industrial park for residents allocation, hectares
23 ha
Permitted use of land plots in the industrial park
104
Permissible hazard class for companies, structures and other facilities to be located
V
Legal grounds for the management company s disposal of the industrial park territory
Agency agreement
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
60000 m2
Maximum ceiling height of industrial premises, meters
12 m
Storage area, square meters
0 m2
Office areas, square meters
17000 m2
Total area of industrial park manufacturing buildings/premises, square meters
500000 m2
Park Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
32 MW
Free available electricity (power) supply capacity, MW
6,9 MW
Electricity supply source
Connection to external networks
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
0 rub./kWh
Total gas supply capacity, cubic meters/hour
8000 m3/h
Available gas supply capacity, cubic meters/hour
2000 m3/h
Gas supply tariff, cubic meters/hour
0 rub/m3
Total heating supply capacity, gigacalories/hour
55,8 Gcal / h
Free available heating supply, gigacalories/hour
0 Gcal / h
Heating supply source
Private boiler room
Heat supply tariff, rub/gigacalories
0 rub/Gcal
Total water supply capacity, cubic meters/hour
10,52 m3/h
Available water supply capacity, cubic meters/hour
3,3 m3/h
Water supply source
Private water intake facility
Water supply tariff
0 rub/m3
Total sewage system capacity, cubic meters/hour
0 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
TOSER