Rent
Industrial park Ugra
ХМАО
34, Bazovaya str., Surgut, Khanty-Mansiyskiy AO-Ugra, Russian Federation, 628401
Type of park
Brownfield
Form of ownership
Private
Created in
2018
Park status
Operating
Management company name
ООО "УК "Индустриальный парк "Югра"
Taxpayer Personal Identification Number (INN) of Management company
8602277460
Website of industrial park
www.ugrapark.com
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
8,7 ha
Available area of industrial park for residents allocation, hectares
2 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
для эксплуатации комплекса зданий и сооружений
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
0 rub/ha
Average rental price for the land site, rub./hectare per year
0 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
2790,8 m2
Maximum ceiling height of industrial premises, meters
10.9 m
The presence of a crane beam
Yes
Max floor load
15 t/m2
Storage area, square meters
4987 m2
Office areas, square meters
1656 m2
Average selling price for manufacturing buildings/premises, rub./m2
0 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
6000 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
15791 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
2.6 MW
Free available electricity (power) supply capacity, MW
0,7 MW
Electricity supply source
Connection to external networks
Name of grid company
ООО "Сургутские городские электрические сети"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
нет rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
6,50 rub./kWh
Voltage level for connection of residents
HH (220B - 1kB)
Reliability category
2
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
500 m3/h
Available gas supply capacity, cubic meters/hour
250 m3/h
Gas supply tariff, cubic meters/hour
3,30 rub/m3
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
1,72 Gcal / h
Free available heating supply, gigacalories/hour
0,50 Gcal / h
Heating supply source
Private boiler room
Heat carrier
Water
Heat supply tariff, rub/gigacalories
1436,00 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
0.238 m3/h
Available water supply capacity, cubic meters/hour
0.2 m3/h
Water supply source
External water utility
Water supply tariff
42,0 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
No
Total sewage system capacity, cubic meters/hour
1,0 m3/h
Available sewage system capacity, cubic meters/hour
0,5 m3/h
Total storm drainage capacity
нет m3/h
Free storm drainage capacity
нет m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Income tax, %
нет %
Property tax, %
100 %
Transport tax, %
нет %
Land tax, %
100 %
Other benefits provided
no
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more