Rent / Land plots are not provided
APP ''Stavropolye''
Ставропольский край
photos
Type of park
Greenfield
Form of ownership
Public
Created in
2016
Park status
Intentions
Management company name
ГУП СК "Корпорация развития Ставропольского края"
Taxpayer Personal Identification Number (INN) of Management company
2636218045
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
195,6 ha
Land category of the industrial park territory
Agricultural land
Permitted use of land plots in the industrial park
Для размещения зданий, строений, сооружений, используемых для производства, хранения и первичной переработки сельскохозяйственной продукции
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Rent
Average selling price for the land site, rub./hectare
328245 rub/ha
Average rental price for the land site, rub./hectare per year
880 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
0 m
The presence of a crane beam
No
Total area of industrial park manufacturing buildings/premises, square meters
26000 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
No
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
16 MW
Free available electricity (power) supply capacity, MW
12.348 MW
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
4469.6 m3/h
Available gas supply capacity, cubic meters/hour
3804.4 m3/h
Gas supply tariff, cubic meters/hour
7 rub/m3
Heating Supply
Heating supply
No
Water Supply
Water supply
No
Wastewater and Wastewater Treatment Facilities
Sewage system
No
Storm water drain
No
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Income tax, %
15.5 % на расчетный срок окупаемости, затем 17.5 % %
Property tax, %
0 % первые 5 лет %
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more