Rent
BelKam
Республика Башкортостан
452680, Russia, Republic of Bashkortostan, Neftekamsk, Magistralnaya str., 2
Management company name
ООО "Управляющая компания индустриального парка "БелКам"
Taxpayer Personal Identification Number (INN) of Management company
0264077140
Website of industrial park
www.parkbelkam.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
62,6 ha
Available area of industrial park for residents allocation, hectares
10,7 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
Для размещения производственных зданий
Permissible hazard class for companies, structures and other facilities to be located
II
Legal grounds for the management company s disposal of the industrial park territory
Rent
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
104075,9 m2
Maximum ceiling height of industrial premises, meters
7,4 m
The presence of a crane beam
No
Storage area, square meters
26925,3 m2
Office areas, square meters
9917,6 m2
Average rental price for manufacturing buildings/premises, rub./m2 per year
1200 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
287478 m2
Park Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
No
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
37 MW
Free available electricity (power) supply capacity, MW
30,1 MW
Electricity supply source
Connection to external networks
Name of grid company
ПО "Нефтекамские электрические сети" ООО "Башкирэнерго"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
5,02 rub./kWh
Voltage level for connection of residents
BH (110kB and more)
Total gas supply capacity, cubic meters/hour
2854 m3/h
Available gas supply capacity, cubic meters/hour
1414 m3/h
Gas supply tariff, cubic meters/hour
6,067 rub/m3
Total heating supply capacity, gigacalories/hour
50 Gcal / h
Free available heating supply, gigacalories/hour
30 Gcal / h
Heating supply source
Private boiler room
Heat supply tariff, rub/gigacalories
2125,72 rub/Gcal
Total water supply capacity, cubic meters/hour
20160 m3/h
Available water supply capacity, cubic meters/hour
19176 m3/h
Water supply source
External water utility
Water supply tariff
20,97 rub/m3
Total sewage system capacity, cubic meters/hour
840 m3/h
Available sewage system capacity, cubic meters/hour
570 m3/h
Total storm drainage capacity
5,6 m3/h
Free storm drainage capacity
5,6 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
TOSER