Rent
Bratsk Industrial Park
Иркутская область
photos
photos
photos
photos
photos
photos
photos
Type of park
Brownfield
Form of ownership
Private
Created in
2015
Park status
Operating
Management company name
нет
Taxpayer Personal Identification Number (INN) of Management company
3805727965
Website of industrial park
www.бипарк.рф
National management standart GOST R 56301-2014 "Industrial parks. Requirements
Yes
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
20.7594 ha
Available area of industrial park for residents allocation, hectares
12,33 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
Строительная промышленность, код вида 6.6
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
0 rub/ha
Average rental price for the land site, rub./hectare per year
0 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
8700 m2
Maximum ceiling height of industrial premises, meters
10-12 m
The presence of a crane beam
Yes
Max floor load
без ограничений t/m2
Storage area, square meters
более 1500 m2
Office areas, square meters
2040,1 m2
Average selling price for manufacturing buildings/premises, rub./m2
0 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
0 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
42399 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
3 MW
Free available electricity (power) supply capacity, MW
2,5 MW
Electricity supply source
Connection to external networks
Name of grid company
ООО "Иркутскэнергосбыт"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
3,6-4,6 rub./kWh
Voltage level for connection of residents
HH (220B - 1kB)
Reliability category
2
Gas Supply
Gas supply
No
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
7,030 Gcal / h
Free available heating supply, gigacalories/hour
не регламентирована Gcal / h
Heating supply source
Heating network
Heat carrier
Water
Heat supply tariff, rub/gigacalories
1102,5 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
10-20 m3/h
Available water supply capacity, cubic meters/hour
не регламентировано m3/h
Water supply source
External water utility
Water supply tariff
50,03 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
20 m3/h
Available sewage system capacity, cubic meters/hour
не регламентирована m3/h
Total storm drainage capacity
15 m3/h
Free storm drainage capacity
не регламентирована m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Income tax, %
согласно законодательства РФ %
Property tax, %
согласно законодательства РФ %
Transport tax, %
согласно законодательства РФ %
Land tax, %
согласно законодательства РФ %
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more