Rent
LLC "DIP "Master"
433513, Ulyanovsk region, the city of Dimitrovgrad, Avtostroiteley Avenue, 78 / 10
photos
photos
photos
Type of park
Brownfield
Form of ownership
Private
Created in
2018
Park status
Works
Management company name
JSC "KIP" Master"
Taxpayer Personal Identification Number (INN) of Management company
7329027344
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
Yes
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
16,75 ha
Available area of industrial park for residents allocation, hectares
2 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
Для размещения производственных зданий
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
0 rub/ha
Average rental price for the land site, rub./hectare per year
5 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
26000 m2
Maximum ceiling height of industrial premises, meters
12 m
The presence of a crane beam
Yes
Max floor load
5 t/m2
Storage area, square meters
- m2
Office areas, square meters
15000 m2
Average rental price for manufacturing buildings/premises, rub./m2 per year
1416 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
98876 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
20 MW
Free available electricity (power) supply capacity, MW
15 MW
Electricity supply source
Connection to external networks
Name of grid company
АО "ДААЗ"
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
4 rub./kWh
Gas Supply
Gas supply
No
Gas supply tariff, cubic meters/hour
0 rub/m3
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
10 Gcal / h
Free available heating supply, gigacalories/hour
5 Gcal / h
Heating supply source
Heating network
Heat carrier
Water
Heat supply tariff, rub/gigacalories
47.57 руб./кв.м. rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
100 m3/h
Available water supply capacity, cubic meters/hour
40 m3/h
Water supply source
External water utility
Water supply tariff
28,61 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
100 m3/h
Available sewage system capacity, cubic meters/hour
40 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
TOSER
Income tax, %
0 %
Property tax, %
0 %
Transport tax, %
0 %
Land tax, %
0 %
Location on the map
Show all parks
Other Parks
Malachite Box
Certified
Certified
623391, Sverdlovsk region, g Polevskoy, district West industrial, d 1/1
Brownfield
31 Ha
25 MW
10 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Levoberezhny
Certified
Certified
11 Volkhovskoe Highway, Kirishi, Leningrad region, 187110, Russia
Brownfield
189 Ha
47 MW
Tax Benefits
Built-to-Suit
Read more
EKAD:UZHNIY
Certified
Certified
620000, Свердловская область, Екатеринбург, ул. Профессионалов
Greenfield
200 Ha
20 MW
20 000 m3/h
Built-to-Suit
Read more