Sale / Rent
Московская область
photos
photos
photos
photos
photos
photos
Type of park
Greenfield
Form of ownership
Private
Created in
2017
Management company name
ООО "Мажино"
Taxpayer Personal Identification Number (INN) of Management company
7724289171
Website of industrial park
www.coalco.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
17,3 ha
Available area of industrial park for residents allocation, hectares
2 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
102
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
15000000 rub/ha
Average rental price for the land site, rub./hectare per year
0 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
0 m
The presence of a crane beam
No
Max floor load
0 t/m2
Storage area, square meters
0 m2
Office areas, square meters
0 m2
Average selling price for manufacturing buildings/premises, rub./m2
0 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
0 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
0 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
No
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
2.7 MW
Free available electricity (power) supply capacity, MW
0.3 MW
Electricity supply source
Connection to external networks
Name of grid company
ПАО "Россети- Московский Регион"
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
6.29 rub./kWh
Voltage level for connection of residents
CH2 (6-10kB)
Reliability category
2
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
2000 m3/h
Available gas supply capacity, cubic meters/hour
1400 m3/h
Gas supply tariff, cubic meters/hour
0 rub/m3
Heating Supply
Heating supply
No
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
105 m3/h
Available water supply capacity, cubic meters/hour
50 m3/h
Water supply source
Private water intake facility
Water supply tariff
0 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
105 m3/h
Available sewage system capacity, cubic meters/hour
50 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Location on the map
Show all parks
Materials
2.31 Mb, pdf
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more