Land plots are not provided / Land plots are not provided
Phoenix state industrial park
Smolensk region
Type of park
Greenfield
Form of ownership
Public
Created in
2016
Park status
Designed
Management company name
ООО «Корпорация инвестиционного развития Смоленской области»
Taxpayer Personal Identification Number (INN) of Management company
6732042360
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Description
The Phoenix Industrial Park is a separate industrial area with full-fledged infrastructure for manufacturing, fully supplied with energy resources, capacities, and networks, designed to accommodate modern production enterprises, and managed by a specialized Management Company.
Land plot
Total area of industrial park, hectares
82,5 ha
Available area of industrial park for residents allocation, hectares
41,9423 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
Зона П4 - размещение производственных объектов IV -V класса санитарной классификации (с включением объектов инженерной инфраструктуры)
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Rent
Average selling price for the land site, rub./hectare
2400000 rub/ha
Average rental price for the land site, rub./hectare per year
0.012 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
0 m
The presence of a crane beam
No
Max floor load
0 t/m2
Storage area, square meters
0 m2
Office areas, square meters
0 m2
Total area of industrial park manufacturing buildings/premises, square meters
0 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
No
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
22 MW
Free available electricity (power) supply capacity, MW
15,008 MW
Electricity supply source
Connection to external networks
Name of grid company
филиал МРСК "Центра" - "Смоленскэнерго"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
по утвержденным ставкам за организационные мероприятия rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
5,14 rub./kWh
Voltage level for connection of residents
CH2 (6-10kB)
Reliability category
2
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
1280 m3/h
Available gas supply capacity, cubic meters/hour
687,84 m3/h
Gas supply tariff, cubic meters/hour
5,82 без НДС rub/m3
Heating Supply
Heating supply
No
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
62.5 m3/h
Available water supply capacity, cubic meters/hour
54,41 m3/h
Water supply source
Private water intake facility
Water supply tariff
23,05 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
62.5 m3/h
Available sewage system capacity, cubic meters/hour
54,45 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Property tax, %
0 %
Transport tax, %
0 %
Land tax, %
1,5 %
Location on the map
Show all parks
Other Parks
Republic of Tatarstan
45 Production passage, Naberezhnye Chelny 423804, Republic of Tatarstan, Russia
Brownfield
213 Ha
39 MW
2 349 m3/h
Tax Benefits
Built-to-Suit
Read more
Stavropol region
Stavropol, Kulakov ave., 18
Brownfield
28 Ha
8 MW
492 m3/h
Built-to-Suit
Read more
Krasny Yar
Certified
Certified
Krasnoyarsk region
660050, Krasnoyarsk, Kutuzova Str., 1, building 37, office 3-07
Brownfield
12 Ha
31 MW
Tax Benefits
Built-to-Suit
Read more
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг
Принять