Land plots are not provided / Rent
DELO
photos
Type of park
Brownfield
Form of ownership
Private
Created in
2020
Park status
Works
Management company name
ООО Управляющая Компания "Автопласт"
Taxpayer Personal Identification Number (INN) of Management company
0264078200
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
Yes
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
12,9 ha
Available area of industrial park for residents allocation, hectares
3,7 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
для размещения производственной базы
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Rent
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
21800 m2
Maximum ceiling height of industrial premises, meters
12 m
The presence of a crane beam
Yes
Storage area, square meters
1000 m2
Office areas, square meters
7000 m2
Total area of industrial park manufacturing buildings/premises, square meters
72780 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
3 MW
Free available electricity (power) supply capacity, MW
0,485 MW
Electricity supply source
Connection to external networks
Name of grid company
ООО «Нефтекамские Электрические Сети», ООО "Энергетическая сбытовая компания Башкортостана"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
4 руб. 7 коп. за 1 кВт час. rub/MW
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
20 m3/h
Available gas supply capacity, cubic meters/hour
1100 m3/h
Gas supply tariff, cubic meters/hour
5488 руб. 6 коп. за 1000 куб. м. rub/m3
Heating Supply
Heating supply
Yes
Heating supply source
Heating network
Heat carrier
Water
Heat supply tariff, rub/gigacalories
1831 руб. 82 коп за 1 ГКал rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
1490 куб.м. в месяц m3/h
Water supply source
External water utility
Water supply tariff
18 руб. 14 коп. за 1 куб. м. rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
2,5 км m3/h
Available sewage system capacity, cubic meters/hour
0,4 км m3/h
Total storm drainage capacity
3 км m3/h
Free storm drainage capacity
0,5 км m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Location on the map
Show all parks
Other Parks
Malachite Box
Certified
Certified
623391, Sverdlovsk region, g Polevskoy, district West industrial, d 1/1
Brownfield
31 Ha
25 MW
10 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Levoberezhny
Certified
Certified
11 Volkhovskoe Highway, Kirishi, Leningrad region, 187110, Russia
Brownfield
189 Ha
47 MW
Tax Benefits
Built-to-Suit
Read more
EKAD:UZHNIY
Certified
Certified
620000, Свердловская область, Екатеринбург, ул. Профессионалов
Greenfield
200 Ha
20 MW
20 000 m3/h
Built-to-Suit
Read more