Sale / Land plots are not provided
Industrial park "M-7"
Республика Татарстан
4, Ovrazhnaya streey, Novonikolaevskiy community, Zelenodolskiy district, the Republic of Tatarstan, 422527
photos
photos
photos
photos
photos
photos
Type of park
Greenfield
Form of ownership
Private
Created in
2011
Park status
Operating
Management company name
Industrial park «М-7», LLC
Taxpayer Personal Identification Number (INN) of Management company
1648030864
Website of industrial park
m7development.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
Yes
Accreditation with the Ministry of Industry and Trade of Russia
No
Description
The M-7 Industrial Park is an infrastructure site specially created to accommodate production, consisting of production, storage, office premises, equipped with engineering information communications. Each industrial section of the park is provided with the necessary engineering communications: gas supply, electricity supply, water supply, sewerage networks, telephony and the Internet All engineering communications in the Park are centralized, due to this, the costs of connecting each resident to them are optimized., TEXT
Land plot
Total area of industrial park, hectares
39,5 ha
Available area of industrial park for residents allocation, hectares
0 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
104
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Agency agreement
Average selling price for the land site, rub./hectare
20000000 rub/ha
Average rental price for the land site, rub./hectare per year
0 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
0 m
The presence of a crane beam
No
Max floor load
0 t/m2
Storage area, square meters
0 m2
Office areas, square meters
0 m2
Total area of industrial park manufacturing buildings/premises, square meters
0 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
6 MW
Free available electricity (power) supply capacity, MW
0,5 MW
Electricity supply source
Connection to external networks
Name of grid company
-
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
4,3 rub./kWh
Voltage level for connection of residents
CH2 (6-10kB)
Reliability category
2
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
1157 m3/h
Available gas supply capacity, cubic meters/hour
1000 m3/h
Gas supply tariff, cubic meters/hour
7,6 rub/m3
Heating Supply
Heating supply
No
Total heating supply capacity, gigacalories/hour
0 Gcal / h
Free available heating supply, gigacalories/hour
0 Gcal / h
Heat supply tariff, rub/gigacalories
0 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
42 m3/h
Available water supply capacity, cubic meters/hour
40 m3/h
Water supply source
Private water intake facility
Water supply tariff
12 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
No
Storm water drain
No
Total sewage system capacity, cubic meters/hour
0 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Income tax, %
Нет %
Property tax, %
Нет %
Transport tax, %
Нет %
Land tax, %
Нет %
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more