Rent / Land plots are not provided
Industrial park "Uzlovaya"
Тульская область
Management company name
Regional Corporation for Development and Support of the Tula Region JSC
Taxpayer Personal Identification Number (INN) of Management company
7104046595
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
2076,18 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
Для размещения производственных и административных зданий, строений, сооружений и обслуживающих их объектов
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
1327700 rub/ha
Average rental price for the land site, rub./hectare per year
475910 rub/ha per year
Production properties
The presence of a crane beam
No
Park Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
No
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
60 MW
Free available electricity (power) supply capacity, MW
40 MW
Electricity supply source
Connection to external networks
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
6 rub./kWh
Voltage level for connection of residents
CH2 (6-10kB)
Total gas supply capacity, cubic meters/hour
14108 m3/h
Available gas supply capacity, cubic meters/hour
118 m3/h
Gas supply tariff, cubic meters/hour
7.0 rub/m3
Total water supply capacity, cubic meters/hour
250 m3/h
Available water supply capacity, cubic meters/hour
142 m3/h
Water supply source
Private water intake facility
Water supply tariff
67.9 rub/m3
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment