Sale
ZELENEС Industrial park
Komi Republic
Komi Republic, Syktyvdinsky Municipal District, Zelenets Municipality, Koitybozh Village, Ukhtinskoye highway, 7/2
photos
photos
photos
Type of park
Brownfield
Form of ownership
Private
Created in
2022
Park status
Designed
Management company name
АО «ИП «ЗЕЛЕНЕЦ»
Taxpayer Personal Identification Number (INN) of Management company
1109016459
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Description
The Zelenets Industrial Park is an area for the implementation of investment projects, endowed with a special legal status that gives investors a number of tax benefits and customs preferences, as well as guarantees access to engineering, transport and business infrastructure. You can launch your new or additional production facilities or new warehouses several times faster than at a site that you set up yourself from scratch. We sell and rent: land plots, ready-made solutions for production/warehouses, sorting centers and factories. Plus, we will have benefits for all our residents, such as 0% taxes on profits, land, transport, subsidies and the purchase of equipment and the creation of production facilities up to 100%. Administrative and organizational support: We provide assistance in obtaining the status of an industrial park resident We help with registration of tax benefits and other government support measures. On the territory of the Industrial Park, all external on-site networks are ready, all technological connections to all communications (gas, electricity) have been made. The installation of metal structures of all buildings has been completed. Currently, buildings are being sheathed and floors installed inside buildings. Next, the installation of engineering systems inside industrial buildings and landscaping of the park (asphalting). In 2024, asphalting of the park was partially completed. A complete block transformer substation and a 2 Megawatt power distribution and transformer substation have been commissioned.
Land plot
Total area of industrial park, hectares
9,9 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
П2
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Production properties
The presence of a crane beam
No
Storage area, square meters
1500 m2
Average rental price for manufacturing buildings/premises, rub./m2 per year
600 rub/m2 per year
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
4 MW
Electricity supply source
Connection to external networks
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
978 m3/h
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
2,1 Gcal / h
Heating supply source
Private boiler room
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
50 m3/h
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Income tax, %
0 %
Property tax, %
0 %
Transport tax, %
0 %
Land tax, %
0 %
Location on the map
Show all parks
Other Parks
Republic of Tatarstan
45 Production passage, Naberezhnye Chelny 423804, Republic of Tatarstan, Russia
Brownfield
213 Ha
39 MW
2 349 m3/h
Tax Benefits
Built-to-Suit
Read more
Stavropol region
Stavropol, Kulakov ave., 18
Brownfield
28 Ha
8 MW
492 m3/h
Built-to-Suit
Read more
Krasny Yar
Certified
Certified
Krasnoyarsk region
660050, Krasnoyarsk, Kutuzova Str., 1, building 37, office 3-07
Brownfield
12 Ha
31 MW
Tax Benefits
Built-to-Suit
Read more
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг
Принять