Land plots are not provided / Land plots are not provided
в разработке
Краснодарский край
Type of park
Greenfield
Form of ownership
Private
Created in
2021
Park status
Designed
Management company name
в разработке
Taxpayer Personal Identification Number (INN) of Management company
2311311235
Website of industrial park
в разработке
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
17,8 ha
Available area of industrial park for residents allocation, hectares
12,7 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
для эксплуатации производственной базы
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Production properties
The presence of a crane beam
No
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
0 MW
Free available electricity (power) supply capacity, MW
Краснодар MW
Electricity supply source
Connection to external networks
Name of grid company
Краснодар
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
Краснодар rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
Краснодар rub./kWh
Gas Supply
Gas supply
Yes
Heating Supply
Heating supply
No
Water Supply
Water supply
Yes
Water supply source
External water utility
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Availability of treatment facilities
No
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Income tax, %
13,5% налога, поступающего в краевой бюджет %
Property tax, %
1% на первые три года, 3% с 4 по 7 -й год, 23% с 8 по 10 год %
Land tax, %
полностью на срок , не превышающий трёх налоговых периодов %
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more