Rent
Kama Industrial Park "Master"
45 Production passage, Naberezhnye Chelny 423804, Republic of Tatarstan, Russia
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
Type of park
Brownfield
Form of ownership
Private
Created in
2004
Park status
Operating
Management company name
JSC "KIP" Master"
Taxpayer Personal Identification Number (INN) of Management company
1650120258
Website of industrial park
www.kipmaster.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
Yes
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
211,15 ha
Available area of industrial park for residents allocation, hectares
22 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
6.2., 6.2.1, 6.3., 6.5., 6.6., 6.9., 6.11.
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Average rental price for the land site, rub./hectare per year
5562000 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
139524,61 m2
Maximum ceiling height of industrial premises, meters
12 m
The presence of a crane beam
Yes
Max floor load
5 t/m2
Storage area, square meters
77108,32 m2
Office areas, square meters
162940,48 m2
Average rental price for manufacturing buildings/premises, rub./m2 per year
1641 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
1268405 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
44 MW
Free available electricity (power) supply capacity, MW
12 MW
Electricity supply source
Connection to external networks
Name of grid company
собственные ГПП и КТП, подключенные к сетям ООО "ТАТЭНЕРГОСБЫТ", ООО "КАМАЗ-ЭНЕРГО", 44 МВт
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
6,9110 rub./kWh
Voltage level for connection of residents
HH (220B - 1kB)
Reliability category
3
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
4969 m3/h
Available gas supply capacity, cubic meters/hour
0 m3/h
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
42,78 Gcal / h
Free available heating supply, gigacalories/hour
3,4 Gcal / h
Heating supply source
Private boiler room
Heat carrier
Water
Heat supply tariff, rub/gigacalories
58,67 руб./м2 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
22 m3/h
Available water supply capacity, cubic meters/hour
2,5 m3/h
Water supply source
External water utility
Water supply tariff
24,47 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
22 m3/h
Available sewage system capacity, cubic meters/hour
2 m3/h
Total storm drainage capacity
24,7 m3/h
Free storm drainage capacity
3 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
TOSER
Income tax, %
первые 5 лет - 5%, последующие 5 лет - 12% (вместо 20%) %
Property tax, %
0 (вместо 2,2%) %
Land tax, %
0 %
Other benefits provided
Customs payments for technological equipment 0%. Insurance contributions 7.6% (instead of 30%), including: 6% to the Pension Fund, 1.5% to the Social Insurance Fund, 0.1% to the Compulsory Medical Insurance Fund
Location on the map
Show all parks
Other Parks
Russian Federation, Sysert District, Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Chelyabinsk, Eniseiskaya street, 8
Brownfield
189 Ha
48 MW
11 000 m3/h
Tax Benefits
Built-to-Suit
Read more