National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
81 ha
Available area of industrial park for residents allocation, hectares
36 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
производственная деятельность
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
53000000 rub/ha
Average rental price for the land site, rub./hectare per year
0 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
68 m2
Maximum ceiling height of industrial premises, meters
8 m
The presence of a crane beam
Yes
Max floor load
5 t/m2
Storage area, square meters
- m2
Office areas, square meters
- m2
Average selling price for manufacturing buildings/premises, rub./m2
100000 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
0 rub/m2 per year
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
20 MW
Free available electricity (power) supply capacity, MW
15 MW
Electricity supply source
Connection to external networks
Name of grid company
ПАО Россети Ленэнерго
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
- rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
- rub./kWh
Voltage level for connection of residents
CH2 (6-10kB)
Reliability category
3
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
1700 m3/h
Available gas supply capacity, cubic meters/hour
1500 m3/h
Gas supply tariff, cubic meters/hour
- rub/m3
Heating Supply
Heating supply
No
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
50 m3/h
Available water supply capacity, cubic meters/hour
40 m3/h
Water supply source
Private water intake facility
Water supply tariff
- rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
No
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
- m3/h
Available sewage system capacity, cubic meters/hour
- m3/h
Total storm drainage capacity
100 m3/h
Free storm drainage capacity
80 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг