Rent
METAKO
Московская область
photos
Type of park
Brownfield
Form of ownership
Private
Created in
01.07.2002
Park status
Intentions
Management company name
АО "ЭЛМА"
Taxpayer Personal Identification Number (INN) of Management company
7735001395
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
11,8 ha
Available area of industrial park for residents allocation, hectares
1,78 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
под размещение предприятия
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
90 rub/ha
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
5000 m2
Maximum ceiling height of industrial premises, meters
10 m
The presence of a crane beam
Yes
Storage area, square meters
7000 m2
Office areas, square meters
500 m2
Total area of industrial park manufacturing buildings/premises, square meters
37537 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
3 MW
Free available electricity (power) supply capacity, MW
1,5 MW
Electricity supply source
Connection to external networks
Name of grid company
РОССЕТИ
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
3,71 rub./kWh
Voltage level for connection of residents
CH2 (6-10kB)
Reliability category
3
Gas Supply
Gas supply
No
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
5,2 Gcal / h
Free available heating supply, gigacalories/hour
3 Gcal / h
Heating supply source
Private boiler room
Heat carrier
Water
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
20 m3/h
Available water supply capacity, cubic meters/hour
19 m3/h
Water supply source
External water utility
Water supply tariff
49,81 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
20 m3/h
Available sewage system capacity, cubic meters/hour
20 m3/h
Total storm drainage capacity
60 m3/h
Free storm drainage capacity
60 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Location on the map
Show all parks
Other Parks
Санкт-Петербург
197350, Russia, Saint-Petersburg, Doroga v Kamenku, 74
Greenfield
337 Ha
73 MW
Tax Benefits
Built-to-Suit
Read more
Zhukovsky
Certified
Certified
Московская область
Московская область, Жуковский , Жуковский, Береговая
Complex
190 Ha
25 MW
Read more
Esipovo
Certified
Certified
Московская область
Московская область, Есипово, Российская Федерация, Московская область, городской округ Солнечногорск, территория "Индустриальный парк "Есипово"
Greenfield
284 Ha
55 MW
11 000 m3/h
Read more