National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
8,34 ha
Available area of industrial park for residents allocation, hectares
0 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
104
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Rent
Average selling price for the land site, rub./hectare
0 rub/ha
Average rental price for the land site, rub./hectare per year
0 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
2047.0 m2
Maximum ceiling height of industrial premises, meters
12 m
The presence of a crane beam
Yes
Max floor load
3 t/m2
Storage area, square meters
3300 m2
Office areas, square meters
300 m2
Average selling price for manufacturing buildings/premises, rub./m2
0 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
6600 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
68098.9 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
4.033 MW
Free available electricity (power) supply capacity, MW
2 MW
Electricity supply source
Connection to external networks
Name of grid company
ПС Прессовая ПС 110/10 кВт. ООО "Модуль-Энерго" (1 МВт). ПАО "МРСК Центра и Поволжья" (1 МВт). ООО "Энергопроект плюс" (8 МВт). "Распределительный пункт с трансформаторной подстанцией РП/ГП 2*1000 КВА по адресу: УР, г. Ижевск, ул. Воткинское Шоссе" (0,4 МВт).
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
4500000 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
10,17 rub./kWh
Voltage level for connection of residents
CH2 (6-10kB)
Reliability category
3
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
1570 m3/h
Available gas supply capacity, cubic meters/hour
538,2 m3/h
Gas supply tariff, cubic meters/hour
9,25 rub/m3
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
230 Gcal / h
Free available heating supply, gigacalories/hour
0,21 Gcal / h
Heating supply source
Private boiler room
Heat supply tariff, rub/gigacalories
37.7 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
449,5 m3/h
Available water supply capacity, cubic meters/hour
105 m3/h
Water supply source
Private water intake facility
Water supply tariff
91,46 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
17,5 m3/h
Total storm drainage capacity
17,5 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems