Rent
MMK-INDUSTRIAL PARK
Челябинская область
Magnitogorsk, Chelyabinsk region, st. 9 May 3, office №1
photos
photos
photos
photos
photos
photos
photos
Type of park
Brownfield
Form of ownership
Private
Created in
2016
Park status
Operating
Management company name
MMK-INDUSTRIAL PARK
Taxpayer Personal Identification Number (INN) of Management company
7414001428
Website of industrial park
indpark.mmk.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
Yes
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
66,5 ha
Available area of industrial park for residents allocation, hectares
10,6 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
Под иными объектами специального назначения
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
4827935 rub/ha
Average rental price for the land site, rub./hectare per year
4176000 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
147172 m2
Maximum ceiling height of industrial premises, meters
15,3 m
The presence of a crane beam
Yes
Storage area, square meters
32584 m2
Office areas, square meters
38557 m2
Average selling price for manufacturing buildings/premises, rub./m2
2500 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
924 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
370429 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
126 MW
Free available electricity (power) supply capacity, MW
80 MW
Electricity supply source
Connection to external networks
Name of grid company
ООО "Магнитогорская энергетическая компания"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
6,7 rub./kWh
Voltage level for connection of residents
HH (220B - 1kB)
Reliability category
3
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
15000 m3/h
Available gas supply capacity, cubic meters/hour
10000 m3/h
Gas supply tariff, cubic meters/hour
5,88 rub/m3
Heating Supply
Heating supply
No
Total heating supply capacity, gigacalories/hour
0 Gcal / h
Free available heating supply, gigacalories/hour
0 Gcal / h
Heat supply tariff, rub/gigacalories
0 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
170 m3/h
Available water supply capacity, cubic meters/hour
90 m3/h
Water supply source
Private water intake facility
Water supply tariff
34,03 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
460 m3/h
Available sewage system capacity, cubic meters/hour
400 m3/h
Total storm drainage capacity
60624 m3/h
Free storm drainage capacity
60382 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
SEZ
Income tax, %
16.5 %
Property tax, %
0 %
Transport tax, %
0 %
Land tax, %
0 %
Other benefits provided
NO
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more