Management company name
ООО "ТЕХСЕРВИС"
Taxpayer Personal Identification Number (INN) of Management company
0
Website of industrial park
0
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
14,02 ha
Available area of industrial park for residents allocation, hectares
12,8 ha
Permitted use of land plots in the industrial park
104
Permissible hazard class for companies, structures and other facilities to be located
V
Legal grounds for the management company s disposal of the industrial park territory
Agency agreement
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
0 m
Storage area, square meters
0 m2
Office areas, square meters
0 m2
Total area of industrial park manufacturing buildings/premises, square meters
0 m2
Park Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
5 MW
Free available electricity (power) supply capacity, MW
0 MW
Electricity supply source
Connection to external networks
Name of grid company
ОАО "Камчатскэнерго"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
0 rub./kWh
Total gas supply capacity, cubic meters/hour
0 m3/h
Available gas supply capacity, cubic meters/hour
0 m3/h
Gas supply tariff, cubic meters/hour
0 rub/m3
Total heating supply capacity, gigacalories/hour
2450 Gcal / h
Free available heating supply, gigacalories/hour
0 Gcal / h
Heating supply source
Private boiler room
Heat supply tariff, rub/gigacalories
0 rub/Gcal
Total water supply capacity, cubic meters/hour
3300 m3/h
Available water supply capacity, cubic meters/hour
0 m3/h
Water supply source
Private water intake facility
Water supply tariff
0 rub/m3
Total sewage system capacity, cubic meters/hour
0 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
TOSER