Land plots are not provided / Land plots are not provided
Novoaleksandrovsk
Ставропольский край
photos
Type of park
Greenfield
Form of ownership
Public
Created in
2011
Park status
Intentions
Management company name
ГУП СК "Корпорация развития Ставропольского края"
Taxpayer Personal Identification Number (INN) of Management company
2634088104
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
146.3 ha
Available area of industrial park for residents allocation, hectares
84 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
Для размещения промышленных объектов
Permissible hazard class for companies, structures and other facilities to be located
II
Legal grounds for the management company s disposal of the industrial park territory
Agency agreement
Average selling price for the land site, rub./hectare
2590685 rub/ha
Average rental price for the land site, rub./hectare per year
950 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
0 m
The presence of a crane beam
No
Max floor load
0 t/m2
Storage area, square meters
0 m2
Office areas, square meters
0 m2
Average selling price for manufacturing buildings/premises, rub./m2
0 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
0 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
0 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
No
Power Supply
Electricity (power) supply
No
Total electricity (power) capacity, MW
0 MW
Free available electricity (power) supply capacity, MW
0 MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
5.5 rub./kWh
Gas Supply
Gas supply
No
Total gas supply capacity, cubic meters/hour
0 m3/h
Available gas supply capacity, cubic meters/hour
0 m3/h
Gas supply tariff, cubic meters/hour
7 rub/m3
Heating Supply
Heating supply
No
Total heating supply capacity, gigacalories/hour
0 Gcal / h
Free available heating supply, gigacalories/hour
0 Gcal / h
Water Supply
Water supply
No
Total water supply capacity, cubic meters/hour
0 m3/h
Available water supply capacity, cubic meters/hour
0 m3/h
Water supply tariff
23 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
No
Storm water drain
No
Total sewage system capacity, cubic meters/hour
0 m3/h
Available sewage system capacity, cubic meters/hour
0 m3/h
Total storm drainage capacity
0 m3/h
Free storm drainage capacity
0 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Income tax, %
15.5 % на расчетный срок окупаемости, затем 17.5 % %
Property tax, %
0 % первые 5 лет %
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more