National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
1273,83 ha
Available area of industrial park for residents allocation, hectares
689 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
Для размещения промышленных объектов
Permissible hazard class for companies, structures and other facilities to be located
I
Legal grounds for the management company s disposal of the industrial park territory
Rent
Average selling price for the land site, rub./hectare
165757 rub/ha
Average rental price for the land site, rub./hectare per year
44202 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
0 m
The presence of a crane beam
No
Total area of industrial park manufacturing buildings/premises, square meters
0 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
No
Total electricity (power) capacity, MW
40 MW
Free available electricity (power) supply capacity, MW
20,325 MW
Electricity supply source
Connection to external networks
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
6,73 rub./kWh
Voltage level for connection of residents
BH (110kB and more)
Reliability category
2
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
10000 m3/h
Available gas supply capacity, cubic meters/hour
4733 m3/h
Gas supply tariff, cubic meters/hour
7.1 rub/m3
Heating Supply
Heating supply
No
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
2500 m3/h
Available water supply capacity, cubic meters/hour
886 m3/h
Water supply source
External water utility
Water supply tariff
37,63 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
No
Total sewage system capacity, cubic meters/hour
2000 m3/h
Available sewage system capacity, cubic meters/hour
1112 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems