National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Description
Main target of Special Economic Zone « Titanium Valley» is serving positive invest climate as in Sverdlovsk region as well as in whole Russian Federation, for creating investing projects in different industries for Russian companies and Foreign Friendly Countries.
Sverdlovsk region located on a crossroad of main transport routes In center of industrial region of Russian Federation . Any investing projects in machinery/ machine tool industry/metallurgy/chemical industry/ aircraft/woodworking/medicine can be easily realized due to availability of natural resources in current region. As well as a network of Universities and colleges serving requested volume and quality of employees.
Special Economic Zone «Titanium Valley» offer most attractive taxes benefits comparing to other Special Economic Zones. Residents of Special Economic Zone «Titanium Valley» are released from payment of Income taxes in region budget during 10 years from getting first income and also realized from payment of taxes for land and transport during 10 years.
Special Economic Zone «Titanium Valley» creating comfort working conditions for activity of Residents. Managing Company serving a complex support of Residents on each of steps in investing project: from Obtaining Resident Status till Start-up Production and futher activity as One whole window service.
«Verkhya Salda» Area of Special Economic Zone «Titanium Valley» offer ready to use infrastructure for placing production: electricity, gas,water and railways infrastructure: railway station and container yard within SEZ
By Creating investing project in Special Economic Zone «Titanium Valley», competitor advantages and investing potential of industrial leader region of Russian Federation can be used for your benefit.
Land plot
Total area of industrial park, hectares
96,7 ha
Available area of industrial park for residents allocation, hectares
18,57 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
Производственная деятельность
Permissible hazard class for companies, structures and other facilities to be located
II
Legal grounds for the management company s disposal of the industrial park territory
Agreement with the subject of the Russian Federation
Average selling price for the land site, rub./hectare
39000000 rub/ha
Average rental price for the land site, rub./hectare per year
50000 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
The presence of a crane beam
No
Total area of industrial park manufacturing buildings/premises, square meters
70 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
10.285 MW
Free available electricity (power) supply capacity, MW
2,5 MW
Electricity supply source
Connection to external networks
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
8,4999 rub./kWh
Voltage level for connection of residents
CH2 (6-10kB)
Reliability category
2
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
1168 m3/h
Available gas supply capacity, cubic meters/hour
0 m3/h
Gas supply tariff, cubic meters/hour
7,21685 rub/m3
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
12,4 Gcal / h
Free available heating supply, gigacalories/hour
3,5 Gcal / h
Heating supply source
Private boiler room
Heat carrier
Water
Heat supply tariff, rub/gigacalories
1872,59 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
55,33 m3/h
Available water supply capacity, cubic meters/hour
26,16 m3/h
Water supply source
Private water intake facility
Water supply tariff
30,66 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Availability of treatment facilities
No
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
SEZ
Income tax, %
2 %
Property tax, %
0 %
Transport tax, %
0 %
Land tax, %
0 %
Other benefits provided
Льготный займ до 1 млрд рублей под 1% годовых от ВЭБ.РФ (Мера поддержки предпринимателей на территории Моногорода)
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг