Rent
LLC "Technopark Prominvest"
Московская область
Stroittelny bystreet 10
Type of park
Complex
Form of ownership
Private
Created in
2007
Park status
Operating
Management company name
LLC "Technopark Prominvest"
Taxpayer Personal Identification Number (INN) of Management company
7705910851
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
18 ha
Available area of industrial park for residents allocation, hectares
0 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
Земли населенных пунктов, разрешенное использование: под производственными цехами.
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
от 25 000 кв. В данный момент осуществляется строительство: 2 500 кв.м, 6000 кв.м. 7000 кв.м. m2
Maximum ceiling height of industrial premises, meters
14 m
The presence of a crane beam
Yes
Max floor load
10 тонн t/m2
Average rental price for manufacturing buildings/premises, rub./m2 per year
0 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
70 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
15 MW
Free available electricity (power) supply capacity, MW
15 MW
Electricity supply source
Connection to external networks
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
4,5-5,5 рублей за 1 КВт. rub./kWh
Gas Supply
Gas supply
No
Heating Supply
Heating supply
Yes
Water Supply
Water supply
Yes
Water supply source
External water utility
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more