National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Description
The special economic zone of industrial and production type «Stabna» was created in the Smolensk district of the Smolensk region in 2021. SEZ «Stabna» is located on a land plot of 350 hectares, 15 km from the city of Smolensk (380 km to the west of Moscow, 80 km from the border with the Republic of Belarus) near one of the largest customs and logistics terminals in the country, owned by a group of companies Alpha Trans.
Land plot
Total area of industrial park, hectares
348,1 ha
Available area of industrial park for residents allocation, hectares
300 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
Промышленное строительство
Permissible hazard class for companies, structures and other facilities to be located
I
Legal grounds for the management company s disposal of the industrial park territory
Property
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
1158 m2
Maximum ceiling height of industrial premises, meters
8 m
The presence of a crane beam
No
Max floor load
9 t/m2
Total area of industrial park manufacturing buildings/premises, square meters
6366 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
3.43 MW
Free available electricity (power) supply capacity, MW
2.174 MW
Electricity supply source
Connection to external networks
Name of grid company
ПАО "Россети Центр - Смоленскэнерго"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
5 rub./kWh
Voltage level for connection of residents
BH (110kB and more)
Reliability category
2
Gas Supply
Gas supply
No
Total gas supply capacity, cubic meters/hour
2034.8 m3/h
Available gas supply capacity, cubic meters/hour
1800 m3/h
Heating Supply
Heating supply
No
Heating supply source
Private boiler room
Heat carrier
Water
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
40 m3/h
Available water supply capacity, cubic meters/hour
35 m3/h
Water supply source
Private water intake facility
Wastewater and Wastewater Treatment Facilities
Sewage system
No
Storm water drain
Yes
Total storm drainage capacity
838.800 m3/h
Free storm drainage capacity
671.040 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг