Land plots are not provided / Sale
Primorye
Приморский край
Territory of the TOP "Nadezhdinskaya"
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
photos
Type of park
Greenfield
Form of ownership
Private
Created in
2018
Park status
Designed
Management company name
JSC " DIRECTORATE FOR THE DEVELOPMENT OF INDUSTRIAL ZONES»
Taxpayer Personal Identification Number (INN) of Management company
2521015730
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Description
The Primorye Industrial Park was created in 2018 on the site of the Nadezhdinskaya Advanced Development Territory (Primorsky Territory, Nadezhdinsky District). The total area of the land plot is 14.94 hectares. The planned area for construction of production and warehouse premises by the beginning of 2025 is 25,000 m2. As of February 2024, construction was completed and production buildings No. 1 (1,500 m2), No. 2 (1,500 m2), No. 4 (800 m2), No. 5 (540 m2), No. 6 (1,500 m2), No. 7 (1,500 m2), No. 8 (802 m2), construction of production building No. 9 (550 m2) is underway, work has begun on the design of production buildings No. 10, 11 and 12. Plastic production facilities are located on the territory of the industrial park pipes (Primorsky Polymer Pipe Plant LLC), plastic containers (Leru In LLC), automobile filters (Ameng Rus LLC), metal products and structures (StroyInvest LLC). Agreements of intent on the location of production of plastic products were signed with Vector LLC and Volginsky Molding Plastics Plant LLC, biomicrogels (BMG-Vostok LLC). In terms of infrastructure, on-site power supply networks (first stage - 2 MW), water supply and sewerage, storm sewerage, and on-site driveways were built. Preparation of design documentation has begun for the construction of the second stage of power supply networks of the industrial park in order to increase capacity to 10 MW., HTML
Land plot
Total area of industrial park, hectares
14,94 га ha
Available area of industrial park for residents allocation, hectares
10 га ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
Производственная деятельность; Тяжелая промышленность; Автомобилестроительная промышленность; Легкая промышленность; Нефтехимическая промышленность; Строительная промышленность; Целлюлозно-бумажная промышленность; Склады; Коммунальное обслуживание; Связь; Обеспечение научной деятельности; Специальная деятельность
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Rent
Average selling price for the land site, rub./hectare
0 rub/ha
Average rental price for the land site, rub./hectare per year
0 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
8 м m
The presence of a crane beam
Yes
Max floor load
3 т/м2 t/m2
Storage area, square meters
550 m2
Office areas, square meters
0 m2
Average selling price for manufacturing buildings/premises, rub./m2
0 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
4600 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
8146 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
10 MW
Free available electricity (power) supply capacity, MW
8 МВт MW
Electricity supply source
Connection to external networks
Name of grid company
ПАО "ФСК ЕЭС"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 руб./МВт rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
3,15 руб./кВт*ч rub./kWh
Voltage level for connection of residents
HH (220B - 1kB)
Reliability category
2
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
450 m3/h
Available gas supply capacity, cubic meters/hour
450 m3/h
Gas supply tariff, cubic meters/hour
7,5 rub/m3
Heating Supply
Heating supply
No
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
6,6 м3/ч m3/h
Available water supply capacity, cubic meters/hour
6,6 м3/ч m3/h
Water supply source
External water utility
Water supply tariff
33,38 руб./м3 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
0 m3/h
Available sewage system capacity, cubic meters/hour
6,6 m3/h
Total storm drainage capacity
18 m3/h
Free storm drainage capacity
0 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
TOSER
Income tax, %
Да %
Property tax, %
Да %
Transport tax, %
Нет %
Land tax, %
Да %
Other benefits provided
Tariffs for insurance premiums: - for mandatory pension insurance in the amount of 6.0 percent; - for compulsory social insurance in case of temporary disability and in connection with motherhood - 1.5 percent; - for compulsory health insurance - 0.1 percent.
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more