National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Description
Melekess Industrial and Logistics Park: Your Turnkey Business Solution in the Heart of Tatarstan.
A fully-developed site with ready-to-use infrastructure for launching your production, warehouse, or distribution center. Skip lengthy preparations and significant capital investments – start your operations faster.
Key Advantages:
Ample Utility Capacity: Direct connection to power and gas grids with high-volume capacity (up to 5 MW and 10,000 m³/hour). Sufficient for projects of any scale.
Prime Logistics Location: Strategically situated between Naberezhnye Chelny, Nizhnekamsk, and Yelabuga – in the very center of the industrial cluster. Optimize your supply chain, reduce transportation costs, and cut delivery times.
Ready Infrastructure: All utilities are on-site and available. Just move in and start your business.
Establish your production in the center of growth!
Land plot
Total area of industrial park, hectares
100 ha
Available area of industrial park for residents allocation, hectares
82 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
В соответствии с Российским классификатором
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
40000000 rub/ha
Production properties
The presence of a crane beam
No
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
5 MW
Free available electricity (power) supply capacity, MW
5 MW
Electricity supply source
Connection to external networks
Voltage level for connection of residents
BH (110kB and more)
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
10000 m3/h
Available gas supply capacity, cubic meters/hour
10000 m3/h
Heating Supply
Heating supply
No
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
16 m3/h
Available water supply capacity, cubic meters/hour
16 m3/h
Water supply source
External water utility
Wastewater and Wastewater Treatment Facilities
Sewage system
No
Storm water drain
Yes
Availability of treatment facilities
No
Connection to external wastewater disposal systems
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг