Rent / Sale
Sokolovo
Москва
photos
photos
photos
Type of park
Complex
Form of ownership
Private
Created in
2024
Park status
Intentions
Management company name
LLC "Spetsializirovanniy zastroyshik "Teriberskiy Bereg"
Taxpayer Personal Identification Number (INN) of Management company
7728633065
Website of industrial park
www.sokolovo-prom.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
59 ha
Available area of industrial park for residents allocation, hectares
59 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
6.9
Permissible hazard class for companies, structures and other facilities to be located
V
Legal grounds for the management company s disposal of the industrial park territory
Rent
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
300 000 m2
Maximum ceiling height of industrial premises, meters
12,5 m
The presence of a crane beam
No
Max floor load
8 t/m2
Storage area, square meters
285000 m2
Office areas, square meters
15000 m2
Average selling price for manufacturing buildings/premises, rub./m2
80000 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
8000 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
300 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
9 MW
Free available electricity (power) supply capacity, MW
5 MW
Electricity supply source
Connection to external networks
Name of grid company
МСК Энерго
Voltage level for connection of residents
CH2 (6-10kB)
Reliability category
3
Gas Supply
Gas supply
Yes
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
21 Gcal / h
Free available heating supply, gigacalories/hour
6 Gcal / h
Heating supply source
Private boiler room
Heat carrier
Water
Water Supply
Water supply
Yes
Available water supply capacity, cubic meters/hour
12 m3/h
Water supply source
Private water intake facility
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
10 m3/h
Available sewage system capacity, cubic meters/hour
6 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more