National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
28,65 ha
Available area of industrial park for residents allocation, hectares
0 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
104
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Rent
Average selling price for the land site, rub./hectare
0 rub/ha
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
27839.5 m2
Maximum ceiling height of industrial premises, meters
10 m
The presence of a crane beam
Yes
Max floor load
3 t/m2
Storage area, square meters
0 m2
Office areas, square meters
700 m2
Average selling price for manufacturing buildings/premises, rub./m2
37000 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
6684 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
29339.5 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
5 MW
Free available electricity (power) supply capacity, MW
3 MW
Electricity supply source
Connection to external networks
Name of grid company
ПС 110/10кВ «Машзавод
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
350000 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
10,07 rub./kWh
Voltage level for connection of residents
CH2 (6-10kB)
Reliability category
3
Gas Supply
Gas supply
No
Total gas supply capacity, cubic meters/hour
0 m3/h
Available gas supply capacity, cubic meters/hour
0 m3/h
Gas supply tariff, cubic meters/hour
0 rub/m3
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
2.46 Gcal / h
Free available heating supply, gigacalories/hour
0.21 Gcal / h
Heating supply source
Private boiler room
Heat carrier
Water
Heat supply tariff, rub/gigacalories
2737,97 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
150 m3/h
Available water supply capacity, cubic meters/hour
30 m3/h
Water supply source
External water utility
Water supply tariff
46,82 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
0 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг