Rent
Rosva
Type of park
Greenfield
Form of ownership
State-owned
Created in
2009
Park status
Works
Management company name
АО "Корпорация развития Калужской области"
Taxpayer Personal Identification Number (INN) of Management company
04027083322
Website of industrial park
invest.kaluga.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
Yes
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
785 ha
Available area of industrial park for residents allocation, hectares
119,5 ha
Permitted use of land plots in the industrial park
Для размещения промышленных объектов
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Agency agreement
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
0 m
The presence of a crane beam
No
Storage area, square meters
0 m2
Office areas, square meters
0 m2
Total area of industrial park manufacturing buildings/premises, square meters
0 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
56 MW
Free available electricity (power) supply capacity, MW
6 MW
Electricity supply source
Connection to external networks
Name of grid company
внешний (ПС "Росва", ПС "Росва1", ПС "Куровская", РП "Западное", РП "Восточное")
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
0 rub./kWh
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
27085 m3/h
Available gas supply capacity, cubic meters/hour
6067 m3/h
Gas supply tariff, cubic meters/hour
0 rub/m3
Heating Supply
Heating supply
No
Total heating supply capacity, gigacalories/hour
0 Gcal / h
Free available heating supply, gigacalories/hour
0 Gcal / h
Heat supply tariff, rub/gigacalories
0 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
166,6 m3/h
Available water supply capacity, cubic meters/hour
0 m3/h
Water supply source
Private water intake facility
Water supply tariff
0 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
0 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
TOSER
Income tax, %
13,5 %
Property tax, %
0 %
Transport tax, %
0 %
Land tax, %
нет %
Location on the map
Show all parks
Other Parks
Malachite Box
Certified
Certified
623391, Sverdlovsk region, g Polevskoy, district West industrial, d 1/1
Brownfield
31 Ha
25 MW
10 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Levoberezhny
Certified
Certified
11 Volkhovskoe Highway, Kirishi, Leningrad region, 187110, Russia
Brownfield
189 Ha
47 MW
Tax Benefits
Built-to-Suit
Read more
EKAD:UZHNIY
Certified
Certified
620000, Свердловская область, Екатеринбург, ул. Профессионалов
Greenfield
200 Ha
20 MW
20 000 m3/h
Built-to-Suit
Read more