Rent / Land plots are not provided
Rosva
Kaluga region
Management company name
АО "Корпорация развития Калужской области"
Taxpayer Personal Identification Number (INN) of Management company
04027083322
Website of industrial park
invest.kaluga.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
Yes
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
748 ha
Available area of industrial park for residents allocation, hectares
177 ha
Permitted use of land plots in the industrial park
Для размещения промышленных объектов
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Rent
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
0 m
The presence of a crane beam
No
Storage area, square meters
0 m2
Office areas, square meters
0 m2
Total area of industrial park manufacturing buildings/premises, square meters
0 m2
Park Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
65 MW
Free available electricity (power) supply capacity, MW
12,35 MW
Electricity supply source
Connection to external networks
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
0 rub./kWh
Total gas supply capacity, cubic meters/hour
43 m3/h
Available gas supply capacity, cubic meters/hour
10 240 m3/h
Gas supply tariff, cubic meters/hour
0 rub/m3
Total heating supply capacity, gigacalories/hour
0 Gcal / h
Free available heating supply, gigacalories/hour
0 Gcal / h
Heat supply tariff, rub/gigacalories
0 rub/Gcal
Total water supply capacity, cubic meters/hour
239,6 m3/h
Available water supply capacity, cubic meters/hour
42,6 m3/h
Water supply source
External water utility
Water supply tariff
0 rub/m3
Total sewage system capacity, cubic meters/hour
0 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment