Rent
Stavropol Territory Industrial Park "Master"
Ставропольский край
Stavropol, Kulakov ave., 18
photos
photos
photos
photos
photos
Type of park
Brownfield
Form of ownership
Private
Created in
2016
Park status
Operating
Management company name
JSC "KIP" Master"
Taxpayer Personal Identification Number (INN) of Management company
1650120258
Website of industrial park
www.skipmaster.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
Yes
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Description
SKIP "Master" occupies a convenient geographical location in the very center of southern Russia at the intersection of routes from Rostov-on-Don, Nevinnomyssk, Elista, Krasnodar, Makhachkala, is located on a plot of land with an area of 28 hectares, has more than 200 thousand sq.m. of production, warehouse, office space and outdoor areas. SKIP Master offers for rent ready-made production areas with connected communications and lifting mechanisms that allow residents with any type of production to be accommodated. The developed transport network, the presence of railway tracks, proximity to large regional industrial enterprises are an important advantage for the residents of the park. Residents are provided with professional security and video surveillance, a medical center, a canteen, accounting, legal, cleaning services, etc. Considering that the SKIP "Master" project has a social orientation, preferential rental rates have been established for residents of the park with a high quality of preparation of areas, which contributes to the maintenance of small and medium-sized businesses, especially at the stage of its formation and development., HTML
Land plot
Total area of industrial park, hectares
28,1 ha
Available area of industrial park for residents allocation, hectares
0,84 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
для размещения производства
Permissible hazard class for companies, structures and other facilities to be located
V
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
0 rub/ha
Average rental price for the land site, rub./hectare per year
7460400 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
12 m
The presence of a crane beam
Yes
Max floor load
5 t/m2
Storage area, square meters
8 425 m2
Office areas, square meters
8505 m2
Average selling price for manufacturing buildings/premises, rub./m2
0 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
1641 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
136121 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
8.15 MW
Free available electricity (power) supply capacity, MW
4,15 MW
Electricity supply source
Connection to external networks
Name of grid company
Северная подстанция ПАО «Россети Северный Кавказ»
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
5,7 rub./kWh
Voltage level for connection of residents
HH (220B - 1kB)
Reliability category
1
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
241 m3/h
Available gas supply capacity, cubic meters/hour
437 m3/h
Gas supply tariff, cubic meters/hour
6,15 rub/m3
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
7,68 Gcal / h
Free available heating supply, gigacalories/hour
1,75 Gcal / h
Heating supply source
Private boiler room
Heat carrier
Water
Heat supply tariff, rub/gigacalories
35,15 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
210 m3/h
Available water supply capacity, cubic meters/hour
116 m3/h
Water supply source
External water utility
Water supply tariff
54,44 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
система хозяйственно-бытовых стоков m3/h
Available sewage system capacity, cubic meters/hour
внешние сети m3/h
Total storm drainage capacity
внешние сети m3/h
Free storm drainage capacity
внешние сети m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more