Rent
State Stolypin Industrial Park
Saratov region
Saratov, Sokolovy Village, Lesnaya Street, 1000
Type of park
Greenfield
Form of ownership
Public
Created in
2022
Park status
Designed
Management company name
State Stolypin Industrial Park
Taxpayer Personal Identification Number (INN) of Management company
6453169944
Website of industrial park
https://столыпинпарк.рф/
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
84.8 ha
Available area of industrial park for residents allocation, hectares
44.33 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
Размещение технологических, промышленных, агропромышленных парков, бизнес-инкубаторов
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Rent
Average selling price for the land site, rub./hectare
4922100 rub/ha
Average rental price for the land site, rub./hectare per year
653920 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
планируемая 4000 m2
The presence of a crane beam
No
Total area of industrial park manufacturing buildings/premises, square meters
0 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
No
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
No
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
25 MW
Electricity supply source
Connection to external networks
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
4047 m3/h
Heating Supply
Heating supply
No
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
127,3 m3/h
Available water supply capacity, cubic meters/hour
88,86 m3/h
Water supply source
External water utility
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
127,3 m3/h
Available sewage system capacity, cubic meters/hour
88,96 m3/h
Total storm drainage capacity
541,67 m3/h
Free storm drainage capacity
495,05 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Property tax, %
на первые 5 лет 4,5% от налога, исчисленного к уплате по ставке 2,2%, и в размере 5% от налога, исчисленного к уплате по ставке 2%  %
Land tax, %
0% на первые 5 лет %
Location on the map
Show all parks
Other Parks
INDUSTRIAL CITY TITAN
Certified
Certified
Moscow region
Московская область, Ленинский городской округ, Московская область, Ленинский городской округ, сельское поселение Булатниковское
Greenfield
15 Ha
Read more
INDUSTRIAL CITY «KLUCH»
Certified
Certified
Moscow region
Московская область, Ленинский городской округ, сельское поселение Булатниковское
Greenfield
21 Ha
Read more
INDUSTRIAL CITY KOLEDINO
Certified
Certified
Moscow region
Московская область, городской округ Подольск , Московская область, Подольск, микрорайон Климовск, Коммунальная ул. 44
Greenfield
17 Ha
Read more
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг
Принять