Rent
Ярославская область
Type of park
Brownfield
Form of ownership
Public
Created in
0
Park status
Operating
Management company name
Государственное бюджетное учреждение Ярославской области "Корпорация развития малого и среднего предпринимательства (бизнес-инкубатор)" (ГБУ ЯО "Корпорация развития МСП")
Taxpayer Personal Identification Number (INN) of Management company
0
Website of industrial park
www.yarincubator.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
14,2 ha
Available area of industrial park for residents allocation, hectares
6 ha
Permitted use of land plots in the industrial park
104
Permissible hazard class for companies, structures and other facilities to be located
V
Legal grounds for the management company s disposal of the industrial park territory
Agency agreement
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
1500 m2
Maximum ceiling height of industrial premises, meters
7,8 m
Storage area, square meters
0 m2
Office areas, square meters
0 m2
Average rental price for manufacturing buildings/premises, rub./m2 per year
1200 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
39058 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
3 MW
Free available electricity (power) supply capacity, MW
0 MW
Electricity supply source
Connection to external networks
Name of grid company
0
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
0 rub./kWh
Gas Supply
Gas supply
No
Total gas supply capacity, cubic meters/hour
0 m3/h
Available gas supply capacity, cubic meters/hour
0 m3/h
Gas supply tariff, cubic meters/hour
0 rub/m3
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
20 Gcal / h
Free available heating supply, gigacalories/hour
0 Gcal / h
Heating supply source
Private boiler room
Heat supply tariff, rub/gigacalories
0 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
384 m3/h
Available water supply capacity, cubic meters/hour
0 m3/h
Water supply source
Private water intake facility
Water supply tariff
0 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
0 m3/h
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
TOSER
Income tax, %
Нет %
Property tax, %
Нет %
Transport tax, %
Нет %
Land tax, %
Нет %
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more