Rent / Land plots are not provided
Vargashinsky Industrial Park
Курганская область
Type of park
Greenfield
Form of ownership
Private
Created in
2019
Park status
Operating
Management company name
KURGAN INDUSTRIAL PARK LLC
Taxpayer Personal Identification Number (INN) of Management company
4501196552
Website of industrial park
www.vargashi45.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
26,7 ha
Available area of industrial park for residents allocation, hectares
0 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
производственная деятельномть
Permissible hazard class for companies, structures and other facilities to be located
V
Legal grounds for the management company s disposal of the industrial park territory
Rent
Production properties
The presence of a crane beam
No
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
No
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
3.6 MW
Electricity supply source
Connection to external networks
Name of grid company
распределительные сети АО "СУЭНКО"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
5.5 rub./kWh
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
1600 m3/h
Gas supply tariff, cubic meters/hour
5.78 rub/m3
Heating Supply
Heating supply
No
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
20.83 m3/h
Water supply source
External water utility
Water supply tariff
77 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
No
Storm water drain
No
Availability of treatment facilities
No
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
TOSER
Income tax, %
5 %
Property tax, %
0 %
Transport tax, %
0 %
Land tax, %
0 %
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more