Sale / Land plots are not provided
Vorsino
Kaluga region
Management company name
ООО "Индустриальный парк "Ворсино"
Taxpayer Personal Identification Number (INN) of Management company
4027083322
Website of industrial park
indpark.vorsino.com
National management standart GOST R 56301-2014 "Industrial parks. Requirements
Yes
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
1576,15 ha
Available area of industrial park for residents allocation, hectares
127,18 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
Для размещения промышленных объектов
Permissible hazard class for companies, structures and other facilities to be located
V
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
0 rub/ha
Average rental price for the land site, rub./hectare per year
0 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
41000 m2
Maximum ceiling height of industrial premises, meters
12 m
The presence of a crane beam
No
Total area of industrial park manufacturing buildings/premises, square meters
196000 m2
Park Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
240 MW
Free available electricity (power) supply capacity, MW
174 MW
Name of grid company
"филиал ОАО ""МРСК Центра и Приволжья"" ОАО ""Калугаэнерго"""
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
0 rub./kWh
Total gas supply capacity, cubic meters/hour
24000 m3/h
Available gas supply capacity, cubic meters/hour
7450 m3/h
Gas supply tariff, cubic meters/hour
0 rub/m3
Total water supply capacity, cubic meters/hour
166 m3/h
Available water supply capacity, cubic meters/hour
116 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment