National management standart GOST R 56301-2014 "Industrial parks. Requirements
Yes
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Description
IP Bogandinsky is a greenfield type site and is designed to accommodate production facilities.
Land plot
Total area of industrial park, hectares
267,9 ha
Available area of industrial park for residents allocation, hectares
198,7 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
Размещение объектов складского назначения, для размещения объектов производственного назначения, для размещения объектов административного назначения, для размещения объектов дорожного сервиса, для размещения объектов коммунального обслуживания населения, для размещения объектов бытового обслуживания населения, для размещения объектов инженерной инфраструктуры, для размещения объектов транспортной инфраструктуры.
Permissible hazard class for companies, structures and other facilities to be located
II
Legal grounds for the management company s disposal of the industrial park territory
Agreement with the subject of the Russian Federation
Average rental price for the land site, rub./hectare per year
204 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
6 m
The presence of a crane beam
No
Office areas, square meters
- m2
Average selling price for manufacturing buildings/premises, rub./m2
0 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
0 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
2000 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Gravel
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
30 MW
Free available electricity (power) supply capacity, MW
30,1 MW
Electricity supply source
Connection to external networks
Name of grid company
"СУЭНКО"
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
0 rub./kWh
Voltage level for connection of residents
CH1 (35kB)
Reliability category
3
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
2200 m3/h
Available gas supply capacity, cubic meters/hour
2200 m3/h
Gas supply tariff, cubic meters/hour
0 rub/m3
Heating Supply
Heating supply
No
Heating supply source
Private boiler room
Heat carrier
Water
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
2500 m3/h
Available water supply capacity, cubic meters/hour
2500 m3/h
Water supply source
Private water intake facility
Wastewater and Wastewater Treatment Facilities
Sewage system
No
Storm water drain
Yes
Availability of treatment facilities
No
Connection to external wastewater disposal systems
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг