Rent
Industrial Park "New Resource"
Chuvash Republic
79 Krasnoarmeyskaya Street, Kanash, Chuvash Republic, 429300, Russia
photos
Type of park
Complex
Form of ownership
Private
Created in
2023
Park status
Designed
Management company name
New Resource Management, LLC
Taxpayer Personal Identification Number (INN) of Management company
2116496575
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Description
The goal of the "Creation of the New Resource Industrial Park" project pursues several key objectives, related, on the one hand, to the priority areas of socio-economic development of the Chuvash Republic, and on the other hand, to the tasks and needs of the project's initiator and key investor, New Resource Management Company LLC. The main goal of the project is to help deepen the region's specialization in the production of thermal insulation and alkyd resins by creating an industrial platform unique to this region, equipped with all the necessary facilities for small and medium-sized enterprises (SMEs) in the region specializing in manufacturing. New Resource Management Company LLC is the organization that directly manages the property complex of the New Resource Industrial Park, interacts with the residents, and attracts external financial and material resources to create and ensure the functioning of the industrial park's infrastructure. The project to create the New Resource Industrial Park is being implemented from the 1st quarter of 2023. The land plot and property complex facilities are owned by the management company. The property complex includes land plots with a total area of 8.56 hectares and buildings with a total area of 14,267 m²
Land plot
Total area of industrial park, hectares
8.56 ha
Available area of industrial park for residents allocation, hectares
4 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
Для производственно-хозяйственной деятельности
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
2500 m2
Maximum ceiling height of industrial premises, meters
9 m
The presence of a crane beam
Yes
Max floor load
5 t/m2
Storage area, square meters
6200 m2
Office areas, square meters
2000 m2
Average rental price for manufacturing buildings/premises, rub./m2 per year
500 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
16500 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
6 MW
Free available electricity (power) supply capacity, MW
5 MW
Electricity supply source
Connection to external networks
Name of grid company
ООО "Региональная энергетическая компания"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
7 rub./kWh
Voltage level for connection of residents
HH (220B - 1kB)
Reliability category
2
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
600 m3/h
Available gas supply capacity, cubic meters/hour
500 m3/h
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
0,86 Gcal / h
Free available heating supply, gigacalories/hour
0,86 Gcal / h
Heating supply source
Private boiler room
Heat carrier
Water
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
10 m3/h
Available water supply capacity, cubic meters/hour
10 m3/h
Water supply source
External water utility
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
10 m3/h
Available sewage system capacity, cubic meters/hour
10 m3/h
Total storm drainage capacity
1000 m3/h
Free storm drainage capacity
1000 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
TOSER
Income tax, %
5 %
Property tax, %
0 %
Transport tax, %
0 %
Land tax, %
0 %
Location on the map
Show all parks
Other Parks
Republic of Tatarstan
45 Production passage, Naberezhnye Chelny 423804, Republic of Tatarstan, Russia
Brownfield
213 Ha
39 MW
2 349 m3/h
Tax Benefits
Built-to-Suit
Read more
Stavropol region
Stavropol, Kulakov ave., 18
Brownfield
28 Ha
8 MW
492 m3/h
Built-to-Suit
Read more
Krasny Yar
Certified
Certified
Krasnoyarsk region
660050, Krasnoyarsk, Kutuzova Str., 1, building 37, office 3-07
Brownfield
12 Ha
31 MW
Tax Benefits
Built-to-Suit
Read more
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг
Принять