Sale / Rent
Kotovo
Moscow region
Russia, 143322, Moscow region, Naro-Fominsk , Ateptsevo settlement , Kuptsa Alyoshina sqr., bld.№1, office 203 Tel.: +7 (495) 992 2782
photos
photos
photos
photos
photos
Type of park
Greenfield
Form of ownership
Private
Created in
2006
Park status
Operating
Management company name
Narpromrazvitie LLC
Taxpayer Personal Identification Number (INN) of Management company
5030053753
Website of industrial park
kotovo-mpo.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
Yes
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
506,5 ha
Available area of industrial park for residents allocation, hectares
327 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
1.7; 1.8; 1.15; 4.0 - 4.4; 4.9.1.; 6.0; 6.2; 6.3; 6.4 - 6.6; 6.9; 6.11; 6.12
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
5520 m2
Maximum ceiling height of industrial premises, meters
8 m
The presence of a crane beam
Yes
Storage area, square meters
0 m2
Office areas, square meters
0 m2
Total area of industrial park manufacturing buildings/premises, square meters
5520 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
40 MW
Free available electricity (power) supply capacity, MW
25 MW
Electricity supply source
Own generation
Name of grid company
Собственный питающий центр ПС "Котово", 25МВт
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
21000000 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
0 rub./kWh
Reliability category
2
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
27000 m3/h
Available gas supply capacity, cubic meters/hour
25000 m3/h
Gas supply tariff, cubic meters/hour
0 rub/m3
Heating Supply
Heating supply
No
Total heating supply capacity, gigacalories/hour
0 Gcal / h
Free available heating supply, gigacalories/hour
0 Gcal / h
Heat supply tariff, rub/gigacalories
0 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
167 m3/h
Available water supply capacity, cubic meters/hour
140 m3/h
Water supply source
Private water intake facility
Water supply tariff
0 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
83 m3/h
Available sewage system capacity, cubic meters/hour
75 m3/h
Total storm drainage capacity
414 m3/h
Free storm drainage capacity
313 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Income tax, %
Нет %
Property tax, %
Нет %
Transport tax, %
Нет %
Land tax, %
Нет %
Location on the map
Show all parks
Materials
10.25 Mb, pdf
Other Parks
Sverdlovsk region
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Sverdlovsk region
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Chelyabinsk region
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more