Sale
Kultaevo
Пермский край
Perm region, selo Kultaevo
Type of park
Greenfield
Form of ownership
Private
Created in
2019
Park status
Designed
Management company name
BAUINVESTGROUP
Taxpayer Personal Identification Number (INN) of Management company
5902225932
Website of industrial park
kultaevopark.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
Yes
Land plot
Total area of industrial park, hectares
19,2 ha
Available area of industrial park for residents allocation, hectares
13,50 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
Зона ПVI Индустриальные парки
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Production properties
The presence of a crane beam
No
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
6 MW
Free available electricity (power) supply capacity, MW
4 MW
Electricity supply source
Own generation
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
0 rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
4,10 rub./kWh
Voltage level for connection of residents
HH (220B - 1kB)
Reliability category
1
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
2500 m3/h
Available gas supply capacity, cubic meters/hour
1300 m3/h
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
8 Gcal / h
Free available heating supply, gigacalories/hour
5 Gcal / h
Heating supply source
Private boiler room
Heat carrier
Water
Heat supply tariff, rub/gigacalories
996 rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
20 m3/h
Available water supply capacity, cubic meters/hour
16 m3/h
Water supply source
Private water intake facility
Water supply tariff
28,17 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
10 m3/h
Available sewage system capacity, cubic meters/hour
6 m3/h
Total storm drainage capacity
20 m3/h
Free storm drainage capacity
15 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Income tax, %
13,5 %
Property tax, %
1,1 %
Transport tax, %
Да %
Land tax, %
0 %
Location on the map
Show all parks
Materials
4.6 Mb, pdf
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more