National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
24 га ha
Available area of industrial park for residents allocation, hectares
2,4 га ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
производственная деятельность
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Rent
Average selling price for the land site, rub./hectare
485 rub/ha
Production properties
The presence of a crane beam
No
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
No
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
650 MW
Name of grid company
ПАО «Россети»
Reliability category
3
Gas Supply
Gas supply
Yes
Heating Supply
Heating supply
No
Water Supply
Water supply
No
Wastewater and Wastewater Treatment Facilities
Sewage system
No
Storm water drain
No
Availability of treatment facilities
No
Connection to external wastewater disposal systems
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг