Sale / Land plots are not provided
Dobrograd-1
Vladimir region
Zvezdny boulevard, b.1, 2 floor, room 20, Dobrograd, Novoselskoe village, Kovrov district, Vladimir Region, Russian Federation, 601967
photos
photos
photos
photos
photos
photos
Type of park
Greenfield
Form of ownership
Private
Created in
2020
Park status
Operating
Management company name
Dobrograd
Taxpayer Personal Identification Number (INN) of Management company
3305796431
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Description
The special economic zone of the industrial and production type "Dobrograd - 1" is a ready–made private site on the territory of which a special regime of entrepreneurial activity is carried out. The Dobrograd-1 SEZ offers all residents a Turnkey Land format, which provides not just the sale of land, but a whole range of additional advantages: -Sale of a land plot into ownership -Ready-made new engineering infrastructure connected to the site -The location is 240 km from Moscow and 2.5 hours from Domodedovo airport -Reduction of financial costs by up to 35% due to tax and customs benefits -Assistance to the management company at all stages of production start-up -2-fold reduction in the start-up time due to the reduction of administrative barriers -The unique agglomeration of the city and the SEZ: access to all infrastructure and residential resources The format of a private SEZ makes it possible not to depend on federal funding, to be flexible and prompt in making any decisions, and to choose.
Land plot
Total area of industrial park, hectares
211 ha
Available area of industrial park for residents allocation, hectares
148 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
Легкая промышленность, научно-производственная деятельность
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
35000000 rub/ha
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
- m2
Maximum ceiling height of industrial premises, meters
- m
The presence of a crane beam
No
Max floor load
- t/m2
Storage area, square meters
- m2
Office areas, square meters
- m2
Average selling price for manufacturing buildings/premises, rub./m2
0 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
0 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
0 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
20 MW
Free available electricity (power) supply capacity, MW
15 MW
Electricity supply source
Connection to external networks
Name of grid company
-
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
- rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
6,1 rub./kWh
Voltage level for connection of residents
BH (110kB and more)
Reliability category
3
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
8000 m3/h
Available gas supply capacity, cubic meters/hour
8000 m3/h
Gas supply tariff, cubic meters/hour
6,2 rub/m3
Heating Supply
Heating supply
No
Total heating supply capacity, gigacalories/hour
- Gcal / h
Free available heating supply, gigacalories/hour
- Gcal / h
Heat supply tariff, rub/gigacalories
- rub/Gcal
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
4000 m3/h
Available water supply capacity, cubic meters/hour
4000 m3/h
Water supply source
Private water intake facility
Water supply tariff
55 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
5800 m3/h
Available sewage system capacity, cubic meters/hour
5800 m3/h
Total storm drainage capacity
115 200 m3/h
Free storm drainage capacity
115 200 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
SEZ
Income tax, %
2 %
Property tax, %
0 %
Transport tax, %
0 %
Land tax, %
0 %
Other benefits provided
VAT - 0%, customs duties - 0% when using the STZ (Free Customs Zone) procedure
Location on the map
Show all parks
Materials
10.38 Mb, pdf
Other Parks
Sverdlovsk region
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Sverdlovsk region
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Sverdlovsk region
Sverdlovsk region Sysertsky district, 1470 m. southwest from the village. Patrushi
Brownfield
121 Ha
Tax Benefits
Built-to-Suit
Read more
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг
Принять