Russia, Moscow region, Shmatovo village, st. Industrialnaya, ow. 4, bldg. 1
Type of park
Greenfield
Form of ownership
Private
Created in
2015
Park status
Operating
Management company name
Управляющая Компания Ступино Квадрат
Taxpayer Personal Identification Number (INN) of Management company
5045054140
Website of industrial park
gdpquadrat.com
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Description
The Stupino Quadrat Special Economic Zone was established on August 8, 2015 by Decree of the Government of the Russian Federation No. 826 as the first SEZ fully owned and developed by a private investor without attracting budget funding.
During the existence of the IP SEZ "Stupino Quadrat" attracted 38 investors (buyers of land plots in the SEZ), 14 of which passed the expert council of the Ministry of Investments, Industry and Science of the Moscow Region. In total, by 2030, it is planned to attract 200 industrial enterprises, expand the territory of the SEZ to 981.6 hectares; 43.5 billion rubles total investment.
2,500 jobs have been created on the territory of the park; the volume of attracted investments is more than 50 billion rubles, and all this is private investment.
The own railway was put into operation.
Land plot
Total area of industrial park, hectares
431.3 ha
Available area of industrial park for residents allocation, hectares
339.1 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
102
Permissible hazard class for companies, structures and other facilities to be located
II
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
50000000 rub/ha
Average rental price for the land site, rub./hectare per year
0 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
0 m
The presence of a crane beam
No
Total area of industrial park manufacturing buildings/premises, square meters
0 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
No
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
100 MW
Free available electricity (power) supply capacity, MW
60 MW
Electricity supply source
Connection to external networks
Name of grid company
ООО "Энергоснабжение Ступино Квадрат"
The cost of connecting to the power grid on the territory of industrial parks residents, rub/MW
входит в пакетное предложение rub/MW
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
4,5 rub./kWh
Voltage level for connection of residents
CH2 (6-10kB)
Reliability category
2
Gas Supply
Gas supply
Yes
Total gas supply capacity, cubic meters/hour
65000 m3/h
Available gas supply capacity, cubic meters/hour
50000 m3/h
Gas supply tariff, cubic meters/hour
4,75 rub/m3
Heating Supply
Heating supply
No
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
25000 m3/h
Available water supply capacity, cubic meters/hour
15000 m3/h
Water supply source
Private water intake facility
Water supply tariff
32,39 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
15000 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems