Управляющая компания Промышленно-логистического парка "Иня"
Taxpayer Personal Identification Number (INN) of Management company
5410152366
Website of industrial park
www.inya-park.ru
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
72 ha
Available area of industrial park for residents allocation, hectares
50 ha
Land category of the industrial park territory
Lands for industry, energy, transport, communications, radio broadcasting, television, informatics, land for space activities, land for defense, security and other special purpose land
Permitted use of land plots in the industrial park
Производственная деятельность (6.0), Автомобилестроительная промышленность (6.2.1), Легкая промышленность (6.3), Фармацевтическая промышленность (6.3.1), Пищевая промышленность (6.4), Нефтехимическая промышленность (6.5), Строительная промышленность (6.6), Связь (6.8), Склад (6.9), Складские площадки (6.9.1), Целлюлозно-бумажная промышленность (6.11), Научно-производственная деятельность (6.12), Железнодорожные пути (7.1.1), Обслуживание железнодорожных перевозок (7.1.2), Размещение автомобильных дорог (7.2.1)
Permissible hazard class for companies, structures and other facilities to be located
IV
Legal grounds for the management company s disposal of the industrial park territory
Rent
Production properties
The presence of a crane beam
No
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
Yes
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
4 MW
Free available electricity (power) supply capacity, MW
4,9 MW
Electricity supply source
Connection to external networks
Name of grid company
Россети
Voltage level for connection of residents
HH (220B - 1kB)
Gas Supply
Gas supply
No
Heating Supply
Heating supply
Yes
Water Supply
Water supply
Yes
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Этот сайт использует cookie-файлы, чтобы помочь Вам в навигации, а также для предоставления лучшего пользовательского опыта и анализа использования наших продуктов и услуг