Sale / Rent
Special economic zone of industrial-production type "Kulibin"
Нижегородская область
Type of park
Complex
Form of ownership
Public
Created in
2020
Park status
Operating
Management company name
Nizhny Novgorod Region Development Corporation
Taxpayer Personal Identification Number (INN) of Management company
5260351747
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
724,7 ha
Available area of industrial park for residents allocation, hectares
252 ha
Land category of the industrial park territory
Lands of settlements
Permitted use of land plots in the industrial park
Для иных видов использования, характерных для населенных пунктов;производственная деятельность; для размещения производственных зданий
Permissible hazard class for companies, structures and other facilities to be located
I
Legal grounds for the management company s disposal of the industrial park territory
Property
Average selling price for the land site, rub./hectare
70000 rub/ha
Average rental price for the land site, rub./hectare per year
45000 rub/ha per year
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
29432,4 m2
Maximum ceiling height of industrial premises, meters
9 m
The presence of a crane beam
No
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Asphalt
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
Yes
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
125 MW
Electricity supply source
Connection to external networks
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
5,95 (без учета НДС) rub./kWh
Reliability category
2
Gas Supply
Gas supply
No
Total gas supply capacity, cubic meters/hour
49700 m3/h
Gas supply tariff, cubic meters/hour
7,22 rub/m3
Heating Supply
Heating supply
Yes
Total heating supply capacity, gigacalories/hour
39 Gcal / h
Heating supply source
Private boiler room
Heat carrier
Water
Water Supply
Water supply
Yes
Total water supply capacity, cubic meters/hour
1554м3/ч m3/h
Water supply source
External water utility
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
1038м3/ч m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
Yes
Benefits and Government Support
Preferential treatment for businesses
SEZ
Income tax, %
*2% - первые 5 лет, 5%- следующие 5 лет, 14,5% до 2069. * с налогового периода, в котором получена прибыль, подлежащая налогообложению %
Property tax, %
0 % первые 10 лет %
Transport tax, %
0% первые 10 лет. %
Land tax, %
0 % первые 5 лет %
Location on the map
Show all parks
Materials
2.36 Mb, pdf
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more