Land plots are not provided / Land plots are not provided
Solnechny
Ставропольский край
photos
Type of park
Greenfield
Form of ownership
Public
Created in
2015
Park status
Designed
Management company name
ГУП СК "Корпорация развития Ставропольского края"
Taxpayer Personal Identification Number (INN) of Management company
2634088104
Website of industrial park
National management standart GOST R 56301-2014 "Industrial parks. Requirements
No
Accreditation with the Ministry of Industry and Trade of Russia
No
Land plot
Total area of industrial park, hectares
391,6 ha
Available area of industrial park for residents allocation, hectares
0 ha
Land category of the industrial park territory
Agricultural land
Permitted use of land plots in the industrial park
Для сельскохозяйственного производства
Permissible hazard class for companies, structures and other facilities to be located
III
Legal grounds for the management company s disposal of the industrial park territory
Rent
Average selling price for the land site, rub./hectare
122649 rub/ha
Production properties
Available area of industrial park manufacturing buildings/premises, square meters
0 m2
Maximum ceiling height of industrial premises, meters
0 m
The presence of a crane beam
No
Max floor load
0 t/m2
Storage area, square meters
0 m2
Office areas, square meters
0 m2
Average selling price for manufacturing buildings/premises, rub./m2
0 rub/м2
Average rental price for manufacturing buildings/premises, rub./m2 per year
0 rub/m2 per year
Total area of industrial park manufacturing buildings/premises, square meters
872242 m2
Park Infrastructure
Transport Infrastructure
Existing connection of industrial park to road
Unpaved
Connection of industrial park to the railway
No
Parking for cargo vehicles on the territory of the industrial park
No
Power Supply
Electricity (power) supply
Yes
Total electricity (power) capacity, MW
150 MW
Free available electricity (power) supply capacity, MW
0 MW
Electricity supply source
Connection to external networks
Average electricity tariff for industrial enterprises in the industrial park, rub/kWh
4,2 rub./kWh
Gas Supply
Gas supply
No
Total gas supply capacity, cubic meters/hour
0 m3/h
Available gas supply capacity, cubic meters/hour
0 m3/h
Gas supply tariff, cubic meters/hour
7 rub/m3
Heating Supply
Heating supply
No
Total heating supply capacity, gigacalories/hour
0 Gcal / h
Free available heating supply, gigacalories/hour
0 Gcal / h
Water Supply
Water supply
No
Total water supply capacity, cubic meters/hour
0 m3/h
Available water supply capacity, cubic meters/hour
0 m3/h
Water supply tariff
23 rub/m3
Wastewater and Wastewater Treatment Facilities
Sewage system
Yes
Storm water drain
Yes
Total sewage system capacity, cubic meters/hour
0 m3/h
Available sewage system capacity, cubic meters/hour
0 m3/h
Total storm drainage capacity
0 m3/h
Free storm drainage capacity
0 m3/h
Availability of treatment facilities
Yes
Connection to external wastewater disposal systems
No
Benefits and Government Support
Preferential treatment for businesses
No preferential treatment
Income tax, %
15.5 % на расчетный срок окупаемости, затем 17.5 % %
Property tax, %
0 % первые 5 лет %
Location on the map
Show all parks
Other Parks
Свердловская область
Uktus Airport
Brownfield
96 Ha
3 MW
1 168 m3/h
Tax Benefits
Built-to-Suit
Read more
Свердловская область
Vladislava Tetuhina st
Greenfield
298 Ha
6 MW
20 000 m3/h
Tax Benefits
Built-to-Suit
Read more
Челябинская область
Chelyabinsk, Eniseiskaya street, 8
Brownfield
188 Ha
48 MW
5 000 m3/h
Tax Benefits
Built-to-Suit
Read more